The TSX Broadway Documentation Project

How StoryTrack Captured History in the Making

Days

Hours Of Footage

Videos

Impossible Story That Captivated The World

Project Overview

Picture this: Times Square, 2022. A $3 billion project is already years into construction. Engineers have been working on the impossible—lifting a 105-year-old, 14 million-pound theater 30 feet into the air while simultaneously demolishing and rebuilding around it.

Then someone at L&L Holding had a realization:
“We have to document this.”

They called StoryTrack.

By the time we arrived, the most complex engineering phases were already underway. What happened next became a masterclass in strategic documentation—proving that it’s never too late to start capturing an incredible story, even when you’re already making history.

The result? Award-winning content that aired on PBS, generated millions of views, and transformed ongoing construction into a cultural phenomenon.

The Challenge
When "Impossible" Meets "Document This"

The Engineering Marvel

TSX Broadway wasn’t your typical construction project. This was engineering theater in the world’s most scrutinized location:

  • Simultaneous demolition and construction on the busiest corner of the western hemisphere
  • 105-year-old landmark preservation in the heart of Times Square
  • 14 million-pound theater lift using 34 hydraulic jacks
  • 4-month lifting process at ¼ inch per hour
  • Zero room for error on the most complex construction site in America
Challenge

The Documentation Challenge

While other video teams document finished projects, StoryTrack was tasked with capturing lightning in a bottle

  • Engineering sessions where “impossible” was just another Tuesday
  • Death-defying construction conditions that made other crews nervous
  • Never-before-attempted technical procedures with zero margin for error
  • Cultural moments that would define a generation’s relationship with Times Square
The Documentation Challenge

Why Documentation Mattered Most

For a project this ambitious, every stakeholder needed proof

Partners

Partners

Visual evidence that the impossible was becoming reality

Community

Community

Transparent documentation that built trust through openness

Media

Media

Compelling content that told the complete human story

History

History

Professional documentation of an engineering first

Our Approach: Strategic Moment Capture

While others wait for ribbon cuttings, StoryTrack captures history in the making. Our approach for TSX Broadway was surgical—be there for the moments that matter most.


  • Early 2022

    Vision & Reality Check
  • Mid 2023

    The Impossible Unfolds
  • Late 2023-2024

    Cultural Birth

When dreams meet engineering physics

  • Stakeholder interviews capturing the audacious vision
  • On-site filming as the 105-year-old Palace Theatre was dismantled piece by piece
  • Documentation of early “how are we going to do this?” planning sessions

When determination meets 14 million pounds

  • The simultaneous demolition and construction dance
  • 34 hydraulic jacks beginning their patient, precise work
  • Worker reactions when they realized they were making history
  • Technical procedures that had never been attempted before

When construction becomes cultural phenomenon

Stage Installation & Technical Marvel
  • Installation of the massive performance stage 30 feet above street level
  • Precision fitting of stage doors and performance infrastructure
  • Technical systems integration that made live entertainment possible

Tempo by Hilton Completion
  • Hotel completion and final interior installations
  • Ribbon cutting ceremony marking the official opening
  • Stakeholder celebrations and community unveiling events

Post Malone Concert Phenomenon
  • Post Malone’s legendary concert 30 feet above Times Square
  • The moment that transformed TSX Broadway from construction project to cultural destination
  • Viral content that proved the concept and captivated global audiences

storytrack construction experts aerial

Our Technical Methodology

Equipment That Matched the Ambition:
  • Construction site-certified crew with safety training
  • Multiple camera angles for unrepeatable moments
  • Strategic time-lapse placement in key locations
  • Real-time editing for stakeholder updates

storytrack construction experts aerial
storytrack construction experts aerial

Content Strategy That Delivered:
  • 4-6 optimized videos monthly for ongoing communication
  • Social media content that made development accessible
  • Documentary-quality footage for broadcast standards
  • Award-submission ready deliverables

The Results: From Construction
Site to Cultural Icon

Content Delivered

  • 70 hours of raw footage capturing every critical moment
  • 82 final videos optimized for every platform
  • Complete format library: 4×5, 9×16, 16×9 with captions and motion graphics
  • Broadcast-quality documentary footage

Cultural Achievement

  • Engineering documentation that became historical record
  • Viral moments that elevated Times Square’s cultural significance
  • Educational value for future engineers attempting the impossible
  • Global recognition that transcended typical construction coverage

Industry Impact

StoryTrack understood that TSX Broadway was more than construction it was cultural transformation. Their documentation didn’t just capture what we built, it captured why it mattered. The content they created became an essential tool for investor relations and community engagement

 

— Dara Rubens, SVP Development, L&L Holding Company
StoryTrack understood that TSX Broadway was more than construction it was cultural transformation. Their documentation didn’t just capture what we built, it captured why it mattered. The content they created became an essential tool for investor relations and community engagement

 

— Dara Rubens, SVP Development, L&L Holding Company
“Having StoryTrack embedded throughout the project gave us real-time content that served multiple strategic purposes. From social media to stakeholder presentations to award submissions, their footage became infrastructure for our success, not just marketing decoration.”

 

— Justin Huebener, SVP Operations, L&L Holding Company

Investment & Value: When Documentation
Pays for Itself

Project Context

$3 billion total development

Video Investment

0.015% of total project budget

Value Generated

PBS spotlight, award wins, media buzz, engineering legacy

Returns That Transcended
Investment

  • Industry leadership established through award recognition
  • Media coverage worth millions in earned attention
  • Cultural impact that made the project part of New York’s story
  • Historical preservation of unprecedented engineering achievement

Your Project’s Story Is Waiting

Every ambitious development has an incredible story hiding in plain sight. Most developers just don’t know how to capture it.

TSX Broadway proved that when you combine visionary projects with strategic storytelling, you don’t just build buildings you create cultural landmarks. You don’t just complete construction you make history.

The question isn’t whether your project deserves documentation. The question is whether you’re ready to capture the moments that make it legendary.

Ready to document your project’s impossible moments?