The TSX Broadway Documentation Project
Days
Hours Of Footage
Videos
Impossible Story That Captivated The World
Quick Navigation
Project Overview
Picture this: Times Square, 2022. A $3 billion project is already years into construction. Engineers have been working on the impossible—lifting a 105-year-old, 14 million-pound theater 30 feet into the air while simultaneously demolishing and rebuilding around it.
Then someone at L&L Holding had a realization:
“We have to document this.”
They called StoryTrack.
By the time we arrived, the most complex engineering phases were already underway. What happened next became a masterclass in strategic documentation—proving that it’s never too late to start capturing an incredible story, even when you’re already making history.
The result? Award-winning content that aired on PBS, generated millions of views, and transformed ongoing construction into a cultural phenomenon.
The Challenge
When "Impossible" Meets "Document This"
The Engineering Marvel
TSX Broadway wasn’t your typical construction project. This was engineering theater in the world’s most scrutinized location:
- Simultaneous demolition and construction on the busiest corner of the western hemisphere
- 105-year-old landmark preservation in the heart of Times Square
- 14 million-pound theater lift using 34 hydraulic jacks
- 4-month lifting process at ¼ inch per hour
- Zero room for error on the most complex construction site in America
The Documentation Challenge
While other video teams document finished projects, StoryTrack was tasked with capturing lightning in a bottle
- Engineering sessions where “impossible” was just another Tuesday
- Death-defying construction conditions that made other crews nervous
- Never-before-attempted technical procedures with zero margin for error
- Cultural moments that would define a generation’s relationship with Times Square
Why Documentation Mattered Most
For a project this ambitious, every stakeholder needed proof
Partners
Visual evidence that the impossible was becoming reality
Community
Transparent documentation that built trust through openness
Media
Compelling content that told the complete human story
History
Professional documentation of an engineering first
Our Approach: Strategic Moment Capture
While others wait for ribbon cuttings, StoryTrack captures history in the making. Our approach for TSX Broadway was surgical—be there for the moments that matter most.
-
Early 2022
Vision & Reality Check Mid 2023
The Impossible UnfoldsLate 2023-2024
Cultural Birth
When dreams meet engineering physics
- Stakeholder interviews capturing the audacious vision
- On-site filming as the 105-year-old Palace Theatre was dismantled piece by piece
- Documentation of early “how are we going to do this?” planning sessions
When determination meets 14 million pounds
- The simultaneous demolition and construction dance
- 34 hydraulic jacks beginning their patient, precise work
- Worker reactions when they realized they were making history
- Technical procedures that had never been attempted before
When construction becomes cultural phenomenon
Stage Installation & Technical Marvel
- Installation of the massive performance stage 30 feet above street level
- Precision fitting of stage doors and performance infrastructure
- Technical systems integration that made live entertainment possible
Tempo by Hilton Completion
- Hotel completion and final interior installations
- Ribbon cutting ceremony marking the official opening
- Stakeholder celebrations and community unveiling events
Post Malone Concert Phenomenon
- Post Malone’s legendary concert 30 feet above Times Square
- The moment that transformed TSX Broadway from construction project to cultural destination
- Viral content that proved the concept and captivated global audiences

Our Technical Methodology
Equipment That Matched the Ambition:
- Construction site-certified crew with safety training
- Multiple camera angles for unrepeatable moments
- Strategic time-lapse placement in key locations
- Real-time editing for stakeholder updates


Content Strategy That Delivered:
- 4-6 optimized videos monthly for ongoing communication
- Social media content that made development accessible
- Documentary-quality footage for broadcast standards
- Award-submission ready deliverables
The Results: From Construction
Site to Cultural Icon
Content Delivered
- 70 hours of raw footage capturing every critical moment
- 82 final videos optimized for every platform
- Complete format library: 4×5, 9×16, 16×9 with captions and motion graphics
- Broadcast-quality documentary footage
Cultural Achievement
- Engineering documentation that became historical record
- Viral moments that elevated Times Square’s cultural significance
- Educational value for future engineers attempting the impossible
- Global recognition that transcended typical construction coverage
Industry Impact
Investment & Value: When Documentation
Pays for Itself
Project Context
$3 billion total development
Video Investment
0.015% of total project budget
Value Generated
PBS spotlight, award wins, media buzz, engineering legacy
Returns That Transcended
Investment
- Industry leadership established through award recognition
- Media coverage worth millions in earned attention
- Cultural impact that made the project part of New York’s story
- Historical preservation of unprecedented engineering achievement
Your Project’s Story Is Waiting
Every ambitious development has an incredible story hiding in plain sight. Most developers just don’t know how to capture it.
TSX Broadway proved that when you combine visionary projects with strategic storytelling, you don’t just build buildings you create cultural landmarks. You don’t just complete construction you make history.
The question isn’t whether your project deserves documentation. The question is whether you’re ready to capture the moments that make it legendary.